摘要
介绍了国内某电厂1台前置的25MW高压背压式汽轮发电机组与1台30MW低压凝汽式汽轮发电机组组成55MW双轮双缸发电机组的设计、安装、启动运行情况。
This paper introduces the design erection,starting and operation of a 55MW double axle turbine combined of a 25MW preset Hp back Pressure turbine set and a 30MW LP condensing turbine set.
出处
《东方电气评论》
1995年第3期165-167,180,共4页
Dongfang Electric Review