期刊文献+

漳平发电二厂水下引水钢管的浮运施工

FLOATING -TRANSPORTATION METHOD OF SUPPLYING WATER STEEL PIPES CONSTRUCTION IN CHINA FOREIGN COOPERATION ZHANGPING SECOND FIRE & ELECTRIC PLANT
下载PDF
导出
摘要 漳平发电二厂水系统中二根φ2040×10mm水下引水钢管施工,采用引水钢管直接沉入水中,水面上采用浮箱与水下钢管相连,上浮后拖运就位的施工技术,其施工方法可行,投资少,工期快,给3^#机组提前二个投产提供了可靠的保证。 Two suppling water steel pipes in Zhangping second Fire & Electric plant supplying water systerm were under construltion, A new transportation method was adopted. Fist the steel pipes were sunk down water,then floating-box was bound together with them, whem the steel pipes were floated, the transportation could begin. The constrution method was simple and feasiple, and could save cost and shorten times. It guaranteed tbat the unit 3 generated electricity ahead of schedule.
作者 赵德通
出处 《福建建筑》 1995年第1期41-42,共2页 Fujian Architecture & Construction
关键词 发电厂 引水钢管 水下钢管 浮运 工程施工 浮相 Supplying water steel pipe,floating box,floating transportation to,sink down
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部