摘要
介绍秦皇岛港煤码头四期工程(简称秦煤四期)翻车机房圆形地下连续墙(简称地连墙)的设计,并论述圆形地连墙的计算方法和存在的问题.
The design for the round diaphragm wall of car dumper shed of the fourth Stage Project of Coal Terminal, Qinhuangdao Port is introduced in the paper and the calculation method as well as the existing problems of the round diaphragm wall are discussed in it.
出处
《港工技术》
1995年第4期28-35,共8页
Port Engineering Technology
关键词
连续墙
秦皇岛港
煤码头
翻车机房
设计
round diaphragm wall, elastic foundation beam ,factor of foundation bed