期刊文献+

抚顺市污水综合治理工程(一期)简介

BRIEF INTRODUCTION OF THE COMPREHENSIVE WASTEWATER DISPOSAL PROJECT IN FUSHUN,LIAONING PROVINCE
下载PDF
导出
摘要 抚顺市污水综合治理工程(一期),包括污水截流干渠工程(按远期)及三宝屯污水处理厂工程.截流干渠工程采用城市污水与工业废水分质排放,将已经过二级处理的工业废水从城市污水系统中分离出来,直接排入水体.其余城市污水排放到三宝屯,在三宝屯新建规模为25万rn^3/d一级污水处理厂. The first phase of the comprehensive wastewater disposal project in Fushun, Liaoning Province, North-east China includes the main sewage collection canal (designed on the final capacity) and Sanbaotun wastewater treatment plant. The municipal and' industrial Wastewater are separately discharged into the main canal according the water quality. The industrial wastewater treated by secondary biochemical process is divided from the municipal sewage system and discharged directively into the water body and all the others are discharged to the wastewater treatment plant which is the primary treatment only and with a capacity of 250000 cubic meters per day.
作者 扬晓华
出处 《给水排水》 CSCD 1995年第8期14-15,共2页 Water & Wastewater Engineering
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部