摘要
本文对工程设计中工程方案比选的GIS系统分析进行了探讨研究,着重阐述了工程方案的GIS评价方法和评价模型,并以南水北调西线工程雅砻江调水渠线方案的系统评价为例作了试验。
Abstract This paper explored the application of geographic information system (GIS) in the field of engineer plan evaluation, an evaluation model based on GIS is build, and the Chang-Huang diversion plan in the Western Segment of the Diversion Project from South to North is taken as the case studing.
出处
《国土资源遥感》
CSCD
1995年第4期39-43,共5页
Remote Sensing for Land & Resources