2Mitri H S, Khan U H. Design procedure for cemented fill for open stoping operations[J]. Min Sci Technol, 1991,12(1 ) : 37- 44.
3Chris H, Martel S J. Pit crater formation on Kilauea volcano, Hawaii [ J ]. Journal of Volcanology and Geothermal Research, 1998,86(1/2/3/4):1-18.
4Singh U K, Jain P N, Prasad M. Post-pillar behaviour at deep levels in a copper mine[J ]. International Journal of Rock Mechanics and Mining Science & Geomechanics Abstracts, 1995,32(6) :585 - 593.
5Chen L J, Jiao D. Design procedure for cemented fill for open stoping operations [ J ]. International Journal of Rock Mechanics and Mining Science & Geomechanics Abstracts, 1992,29(1):333 -343.
6Chen L J, Jiao D Y. A design procedure for cemented fill for open stoping operations [ J ]. Mining Science and Technology, 1991,12(3) :333 - 343.
7Xu R Y, Li L X. Application of a combined supporting technique with cable bolts and split friction bolts in fill stoping [J ]. International Journal of Rock Mechanics and Mining Science & Geomechanics Abstracts, 1989, 26 ( 2 ) : 263- 267.
8Ergin A. Design aspects of cemented aggregate fill mixes for tungsten stoping operations [ J ]. Mining Science and Technology, 1984,1 (3) :209 - 214.
9Kawamoto T. Application of damage mechanics for analysing an underground opening problem [J].Material, 1986, 35 (392) :3 - 13.