摘要
对前苏制670t/h锅炉增装蒸汽推动系统,即在原有的底部联箱内加装蒸汽加热分配管方案,并通过强度校核计算,验明方案的可行性,证实在集箱筒体上开孔,可以满足强度要求。
A plan of installing a steam rum system in the 670t/h boiler made in former Soviet Union was proposed. The steam distributing tubes which were used to heating the water were installed in the bottom headers. The strength check calcu-cation verified that the strength requiremenf 'of the header with a hole drilled on its body can be satisfied,so the plan was feasible.