摘要
本文描述了一种分段线性法对大坝加高施工过程进行模拟,并通过实例,对用该方法求得的坝体结构在各施工时段的应力分布进行分析研究。
Stage linear method in this paper is described to simulate the construcion procedureof heightened dams. By using this method,the stress state in the heightened dams in differentconstruction stages is analyzed.
出处
《红水河》
1995年第1期41-45,共5页
Hongshui River
关键词
大坝
坝体
结构应力
混凝土施工
additive dam,structure stress,cencrete construction.