本文介绍了天生桥一级水电站面板堆石坝的建设条件和特点,河道水流控制的规划思想、方案比较选择、设计原则,和面板堆石坝施工程序安排。
This article gives a presentation on the construction condition and peculiarities of con-crete-faced rockfill dam of TSQ-ⅠProject.Ideas on river flow control plan,selection of alter-natives,design principle and construction scheduling for concrete-faced rockfill dam are also dis-cussed.
出处
《红水河》
1995年第4期54-61,共8页
Hongshui River
关键词
大型水电站
面板堆石坝
水流
施工程序
face slab rockfill dam, river water flow control, construction program, TSQ-ⅠProject.