摘要
网络横过图是综合了横道图(甘特图)和网络图的优点而避免其不足的新型图形.将网络横道图应用到编制施工进度表上,对推广网络计划技术有着很大的意义.
The network transverse lined diagram is a new diagram which synchesizes the advantages of transverse lined diagram and network diagram but eliminates their shortcomings. It is meaningful applying the network transverse lined diagram to working out construction progress table in the spreading of network technique.
关键词
网络横道图
网络网
横道图
施工进度
建筑工程
Network transverse lined diagram
Network diagram
Transverse lined diagram
Time parameter
Double code name network diagram
Single code name network diagram