期刊文献+

国产第一台200MW汽轮机高压缸改造

Modification of H- P. Cylinder of the First Chinese-made 200MW Steam Turbine
下载PDF
导出
摘要 国产第一台200MW汽轮机在朝阳电厂启动中,高压缸内缸的内外壁温差过大。影响机组的顺利启动。经过改造,取消了内外缸之间的隔热罩,加装了径向挡汽板,并将一次抽汽口后移,效果良好。后来的哈汽200MW机均已按此改造。 Oh starting of the first Chinese-made 200MW steam turbine in Chao-Yang Power Station, the temperature difference between inner and outer wall surface of H. P. inner easing was so great as to interfere with its smooth starting. After modifying - removing the heat isolating shield between inner and outer casing, adding a radial steam baffle plate, and moving the first steam extraction hole backward ,the result was satisfactory. Later then,Harbin 200MW Steam turbines have been produced in the same way.
作者 金凤祥
出处 《吉林电力技术》 1995年第1期1-4,共4页
关键词 高压缸 蒸汽透平 技术改造 H. P. cylinder. Temperature difference between inner and outer wall surface Modification 200MW turbine set