期刊文献+

洗毛衣废水生化处理工艺研究

Study of washing sweater wastewater by biological treatment
下载PDF
导出
摘要 文章采用水解酸化—间歇式接触氧化法对广东江门市某毛织厂毛衣出厂前的洗涤废水的处理进行了研究。通过研究缺氧柱内pH值及CODCr随时间变化,得出缺氧时间不应该超过8h,4~8h为宜。由24h的停留时间实验结果分析可知,缺氧柱的填充比大于1∶9时,即可取得较高的CODCr去除率。8h水解酸化出水进行接触氧化实验,经过6h的处理,CODCr由250mgL降解到60mgL以下。序批式生物膜法有很好的除磷效果,磷在2h之内可以降到0.5mgL以下。用水解酸化—接触氧化工艺处理洗毛衣废水,最佳的处理工艺参数是:水解酸化时间4~8h,接触氧化池6~8h。 A way to treat washing sweater wastewater from a sweater plant of Guangdong Jiangmen with the combination of hydrolytic acidification reactor followed by biological contact oxidation was investigated. The experiments researching the variety rules of pH and CODCR with HRT in the anaerobic reactor indicated that the HRT of anaerobic reaction shouldn' t exceed 8 hours, HTR for 4 ~ 8 hours was appropriate. It was adequate to acquire high efficiency When the rate of falling of anaerobic reactor was more than 1 : 9. In the aerobic experiments, the CODCr debased from 250 mg/L to 60 mg/L after 8 hours anaerobic reaction and 6 hours aerobic reaction. SBBR can dephosphorize effectively, and the phosphor content could be debased to less than 0.5 mg/L after 2 hours aerobic reaction.In conclusion,the optimal technics parameters of treatment is 4 ~ 8 hours hydrolytic acidification and 6 ~ 8 hours reaction aerobic.
出处 《毛纺科技》 CAS 北大核心 2005年第7期19-21,共3页 Wool Textile Journal
关键词 水解酸化 接触氧化 洗毛衣废水 hydrolytic acidification biological contact oxidation washing sweater wastewater
  • 相关文献

参考文献4

二级参考文献11

  • 1GRAZON Z M A,GONZALEZ M S. Biological phosphate and nitrogen removal in a biofilm sequencing batch reactor[J]. Water Sci & Tech,1996,34(1-2) :293-301.
  • 2GONZALES M S,WIDERER P A. Phosphate removal in a biofilm reactor[J]. Water Sci & Tech,1991,23(7-9) :1 405-1 415.
  • 3GONCALVES R F,ROGALLA F. Biological phosphorus removal in fixed film reactors[J]. Water Sci & Tec h, 1992,25(12):165-174.
  • 4GONCALVES R F, LEG L,ROGALLA F. Biological phosphorus uptake in submerged biofilters with nitrogen removal[J]. Water Sci & Tech,1994,29(10-11):135-143.
  • 5KERRN J J P, HENZE M,STRUBE R. Biological phosphorus release and uptake under alternating anaerobic and anoxic conditions in a fixed film reactor[J]. Water Res, 1994,28(5) : 1 253-1 255.
  • 6SHIN H S,PARK H S. Enhanced nutrient removal in porous biomass carrier sequencing batch reactor(PBCSBR)[J]. Water Sci & Tech, 1991,23(4-6) :719-728.
  • 7HELNESS H, ODEGAARD H. Biological phosphorus removal in a sequencing batch moving bed biofilm reactor[J]. Water Sci & Tech,1999,40(4-5) : 161-168.
  • 8HONG S N, KRICHTEN D,RACHWALL A, et al. A biological wastewater treatment system for nutrient removal[A]. Presented at EPA workshop on Bioiogical phosphorus removal in municipal wastewater treatment[C]. Annapolis: Maryland, 1982.
  • 9WENTZEL M C, EKAMA G A, MARAIS G V R. Kinetics of nitrification- denitrification biological phosphorus removal systems[J]. wat Sci Technol, 1991,23(4) :555-565.
  • 10LIE E, WELANDER T. A method for determination of the readily fermentsble organic fraction in municipal wastewater[J]. wat Res,1997,31(6) :1 269-1 274.

共引文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部