从工程经济的角度对路堑与隧道工程可替代方案的费用进行分析,寻找可替代方案费用相同时的临界填挖高度值,并尝试给出方案选择开挖的高度判断值。
This article performs, from the view of economic engineering, an analysis of the alternative schemes of cutting and tunnel works, looking for the critical height value of cut and fill when the alternative schemes are of the same cost, tries to give a judgment value of excavation depth the schemes select.
出处
《铁路工程造价管理》
2005年第4期14-16,共3页
Railway Engineering Cost Management
关键词
路堑与隧道
可替代方案
技术经济