摘要
采用基坑支护理论和桩锚支护结构解决广园东快速路二期工程A24 标高压电塔基础防护的设计和施工问题。工程实践表明,该法获得成功,有应用前景。
Bracing theory of foundation pit and anchoring pile structure was adopted to solve the problem of design and construction of the high voltage tower (el. A24) in Quangyuan east high speed line second stage project, Result shown that such a method was successful and may be used for reference.
出处
《土工基础》
2005年第2期50-52,78,共4页
Soil Engineering and Foundation
关键词
高压电塔
基础防护
桩锚支护结构
high voltage tower, protection of foundation, anchoring pile bracing structure