摘要
北京电视中心基础施工中,对基础梁钢筋、斜板和内墙钢筋要求按施工规范进行施工;在-24.100m标高处地坑内采用吊帮木模板体系,斜板和内墙采用接高模板;对低处基础混凝土和高处基础混凝土采用不同的施工方法,保证了基础工程质量,施工效果良好。
In the foundation construction of Beijing Television Center, it is required that the reinforcement construction in foundation beam, skew slab and inner wall should comply with the construction codes. Hanging wood formwork system is employed for the pit at the elevation of -24.100 m, and high butt formwork for the skew slab and inner wall. As for the lower and upper parts of the foundation, different concreting methods were adopted respectively, which guaranteed the foundation works quality and achieved a good construction effect.
出处
《建筑技术》
北大核心
2005年第8期583-585,共3页
Architecture Technology
关键词
基础
钢筋
模板
混凝土
foundation
steel bar formwork, concrete