大断面黄土隧道施工及工后沉降数值分析 被引量:5

Numerical Analysis on Settlement during Construction and after Construction in Large Section Loess Tunnels
下载PDF
导出
摘要 通过有限元数值计算分析,以黄土区铁路隧道开挖工程为实例,研究探讨了大断面浅埋黄土隧道采用CD法施工期间的衬砌变形与地面沉降,并考虑了衬砌施作时间对施工期间及工后沉降的影响。对于工后沉降分析采用拟静力方法预测隧道在车辆动荷载作用下的沉降变形,所得结论可为黄土区浅埋地下隧道的设计与施工提供参考依据。 By FEM numerical calculation and analysis, taking the railway tunnel excavation projects in loess areas ['or example, the lining deformation and ground settlement of a large section shallow buried loess tunnel during the construction adopting CI) method are researched and discussed;moreover the influences of lining construction time on the settlement during construction period and after construction are considered. Imitativestatic methed is adoptcd for the settlement analysis after construction to predict the settlement deformation of tunnels by the action of dynamic loadings of vehicles. The conclusions obtained will provide a reference for the design and construction of shallow buried underground tunnels in loess areas.
作者 赵洪波
出处 《西部探矿工程》 CAS 2005年第10期101-103,共3页 West-China Exploration Engineering
关键词 黄土地层 铁路隧道 ZK标准活荷 工后沉降 数值分析 stratum railway tunnel ZK standard live load settlement after construction numerical analysis
  • 相关文献

参考文献3

  • 1徐干成 白洪才 郑颖人 刘朝.地下工程支护结构[M].北京:中国水利水电出版社,2001..
  • 2潘吕史.隧道力学数值方法[M].北京:中国铁道出版社,1995..
  • 3.京沪高速铁路南京长江水底隧道沉管段结构在列车振动与地震作用下的安全性论证[R].兰州铁道学院,1999..

共引文献40

同被引文献39

引证文献5

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部