西客站供热厂发电机组基础构造复杂,精度要求高,复杂的基础形状要求确定合理的施工程序和施工缝。柱模板采用组合钢模板,平台板、梁底模采用多层板模板。基础拆模后,所有孔洞、预埋件位置准确,保证了设备安装顺利进行。
The foundation structure of the Thermal Power Plant of the B. W. R. S. C. P. is very com-plicated and required of a high grade accuracy. its complex foundation features have been drawn close attention and designed with an appropriate construction procedures and joints. Its column forms have been designed of the composite steel formwork system with a flat service platform. While its beam bottom's forms have been made of the multiplywood. After the completion of scaffolding's stripping. it has been found that all positions of tile performed openings and allocations of the precast elements are accurately laid out so that the installations of equipments can be completed smoothly.
出处
《建筑技术》
北大核心
1995年第12期743-744,共2页
Architecture Technology