摘要
文中复核计算了大厦口水库拱坝在各种工况的应力状态,通过线性分析(不考虑裂缝影响)和非线性分析(考虑裂缝影响)坝体应力结果的比较,分析了坝体裂缝成因,讨论了大厦口水库拱坝底部裂缝对拱坝运行的安全影响,并提出了对裂缝的处理意见。
The paper rechecks the stress situation of arch dam under working conditions in Lanxi Dashakou reservoir. Through the comparison ot linearanalysis dam stress (considering influence of fissure) and non-linear analysis dam stress (considering influence of fussure),the paper analyses the cause of dam fissure, discusses the influence of fissure in arch dam bottom tothe security of arch dam operation,puts forward the measures of fissure treatment.
出处
《东北水利水电》
2005年第8期8-10,55,共4页
Water Resources & Hydropower of Northeast China