对大体积混凝土基础采用“分段定点、一个坡度、薄层浇筑、循序推进、一次到顶”的斜面浇筑方法和相应的“保温保湿”的养护措施,加快了大体积混凝土基础的施工,防止了裂缝产生。
In order to prevent mass concrete foundation from cracking during hot season construction, batter concreting method and 'thermal insulation and wet keeping' curing measure are taken. So-called batter concreting is to gradually place concrete up to its top section by section and in a uniform gradient.