摘要
双向无粘结预应力混凝土井字梁结构施工中,采取在端头承压垫板上钻小孔定位无粘结筋、与群锚配套使用,省去铸铁喇叭管,简化了施工方法。
The construction of two -way non -adhesive prestressed cri-ss - cross girder is simplified by adoption of such methods as drilling small holes on load-bearing pad under girder's ends, using non-adhesive spacer bar and group anchor, and omitting cast - iron flare tube.
出处
《建筑施工》
1995年第4期17-19,共3页
Building Construction