摘要
结合湖南某2个退役铀矿山废石场边坡设计实例,简要介绍了废石场治理工程中有关边坡稳定化设计方法,加固措施,防、排洪措施等技术问题。
Design methods, reinforcement measures, and flood control measures concerning high slope stabilization in harnessing waste rock site are described in brief according to some examples of two uranium mines in Hunan province.
出处
《铀矿冶》
CAS
北大核心
2005年第3期149-152,共4页
Uranium Mining and Metallurgy
关键词
铀矿山废石场
边坡
稳定化
waste rock sites of uranium mines
hign slope
stabilization