沈阳市富民斜拉桥5#墩主梁1#、1′#块施工简介

Briefing of Construction of Main Girder’s Structure Blocks No.1 and No.1’of Pier No.5 of Shenyang Fumin Cable Stayed Bridge
下载PDF
导出
摘要 沈阳市富民桥主桥为双折线塔单索面预应力混凝土斜拉桥,主桥跨径布置为(89+242+89)m。主桥结构体系为4#墩处塔、墩、梁三者固结,5#墩处塔梁固结、墩梁分离。简要介绍5#墩上部结构1#、1′#块施工技术。 The main bridge of Shenyang Fumin Bridge is a prestressed concrete cable stayed one with double-broken lime tower, single cable plane and spans of 89 plus 242 and 89 meters. Its texture systems are consolidation between tower, pier and girder at pier No. 4 ; Consolidation between tower and girder, and separation of pier from girder at pier No. 5. The paper introduces briefly construction techniques for main girder' s blocks No. 1 and No. 1 'of pier No. 5.
出处 《辽宁交通科技》 2005年第7期59-61,共3页 Liaoning Communication Science and Technology
关键词 斜拉桥 塔梁固结 墩梁分离 临时固结 墩旁托架 预应力混凝土斜拉桥 施工技术 沈阳市 主梁 Cable stayed bridge; Consolidation between tower and girder; Separation of pier from girder; Temporary consolidation; Carriage by pier
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部