摘要
为适应国家招投标体制及市场竞争的需要,施工企业应实行项目经济评估,以促进企业经营效益的提高。项目经济评估的内容按制造成本和期间费用进行划分,结合项目外部环境和企业施工技术水平进行评估。
In order to meet the needs of our country's tender system and the market competition, the method of project economic evaluation should be taken by the construction enterprises, so as to promote the economic benefits to be gained. The project economic evaluation consists of manufacture cost and period expense, which should be evaluated in combination of both the exterior circumstance of the project and the level of the construction technique of the construction enterprise concerned.
出处
《水利水电技术》
CSCD
北大核心
2005年第8期10-12,共3页
Water Resources and Hydropower Engineering
关键词
项目管理
经济评估
制造成本
期间费用
水利水电工程
project management
economic evaluation
manufacture cost
period expense
water conservancy and hydropower project