摘要
针对第五次大面积提速过程中,有关机车、乘务、监控器等三个方面的几个主要的问题,阐述了解决问题的建议和措施。
The quality of railway products means safety and speed.Speed up,locomotive and crew are the key factors of the railway product quality.The recommendations and measures were given to settle the issues in three aspectslocomotive,duty journey and monitorwhich were arisen from the fifth full-scale speed up at railway.
出处
《内燃机车》
北大核心
2005年第8期30-31,39,共3页
Diesel Locomotives
关键词
列车
提速
DF11G型机车
主控制手柄
乘务
单司机
监控器
train
speed up
DF_(11G)
locomotive
master controller handle
duty journey
one-person operation
monitor