根据施工资料、坝体变形及测压管的观测资料,对拓林大坝的变形原因作了分析及探讨,初步得出在防渗墙运行状态正常及粘土心墙可能存在裂缝的结论。
According to the construction data and the observation data on thedam defotmation and the pipe of measuring the water pressure, this paper analy-sed and probcd into the reason for the deforn1ation of the Zalin Dam,We initia-lly reached a conclusion tbat the operational condition of the concrete antiseepagewall is norrnal and the clay core-wall perhapshad cracks.
出处
《江西水利科技》
1995年第3期139-145,共7页
Jiangxi Hydraulic Science & Technology
关键词
大坝
心墙石渣坝
变形
防渗墙
混凝土
The core-wall dam
The concrete antiseepage walli Channel hole(orChannel segment)
Deformation,A dditional Settleznent