摘要 水布垭枢纽工程是清江梯级开发的龙头电站,工程占地跨恩施州巴东县和宜昌市长阳县两县。坝区多为深山峡谷,人多地少,加上国家实施天然林保护工程和“退耕还林”政策,移民安置难度很大,存在一些问题亟待解决。业主清江水布垭建设公司和地方政府高度重视移民工作,从实际出发,采取了一系列措施,解决了诸多矛盾,稳定了坝区局面,为工程顺利进展和移民长治久安打下了坚实基础。 Shuibuya Hydropower Project is the first step of cascade development on Qingjiang River. The project is located across the border between BaDong county EnShi State and ChangYang County of YiChang City. Dam site perching down deep gorges in remoted mountainous area which have many inhabitants and few lands, in recent years, The government is implementing the protection of natural resources and “cut lands to woods” policies, As a result, The settlement of immigration becoming the most serious problem,Both Shuibuya Poject Construction Corporation and Local government are paying outmost attention on this factor, They carried out a series of measures so as to relief the contradiction and stabilized the situation. Owing to all these efforts, A steady foundation was built for constuction and resettlement of immigration。
出处 《水力发电》 北大核心 2005年第7期20-21,共2页 Water Power
关键词 移民安置 管理经验 水布垭水电站 arrangement of resettled experience in management Shuibuya Hydroelectric Project
  • 相关文献

参考文献1

共引文献1

同被引文献1

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部