电厂岩土工程研究 被引量:1

Power Plant Geotechnical Engineering Study
下载PDF
导出
摘要 通过对电厂场地稳定性的评价,确定了建厂的可能性,从区域地层及场地岩土工程地质条件进行分析研究,其中主要对电厂各建筑物地段的地基土进行了研究分析,并进行了地基方案的优化讨论。最终为场地的主要建(构)筑物及附属建筑物提供两种对软土地基处理的方法,并进行了桩基试验以指导施工,使工程进度得以提前,且取得了良好的经济效益。 Through evaluation to the power station place stability, it is very possible to set up the factory. Carrying on the analytical research from the geologic area and the geotechnical engineering geology conditions of the district, especially the research to the foundation soil of each building of power station district analysis, and carrying on the foundation project excellent to turn the discussion. At last, we have provided two kinds of soft lands of the methods of the foundation processing for setting up main buildings and subsidiary buildings in the place, carried on the experiment to guide the construction, to raise project rapidly and obtain good economic performance.
出处 《山西电力》 2005年第4期33-35,共3页 Shanxi Electric Power
关键词 岩土工程 方案优化 地基试验 体制 geotechnical engineering optimizing program foundation experiment system
  • 相关文献

参考文献1

  • 1《工程地质手册》编写委员会编,常士骠.工程地质手册[M]中国建筑工业出版社,1992.

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部