摘要
武汉阳逻长江公路大桥北锚碇大体积混凝土施工中,采取了配合比设计、分层浇筑等一系列措施控制混凝土温度,通过现场监测,混凝土温度控制达到了预期目标。
In this article, authors state of large volume concrete of the north match ratio design, layer pouring and measures reached expected effects. a series of concrete temperature control measures adopted in construction anchor of Wuhan Yangluo Changjiang River Great Road Bridge such as so forth. On-site monitoring data indicate that those temperature control
出处
《施工技术》
CAS
北大核心
2005年第8期44-46,共3页
Construction Technology
关键词
桥梁工程
混凝土
温度控制
监测
bridge engineering
concrete
temperature control
monitoring