摘要
介绍了解台站冬季施工时为保证混凝土质量采取的一系列措施,如调整混凝土配合比、增大水泥用量,提高建筑材料温度,对混凝土拌合设备、泵送设备进行保温等。
In this article, authors introduce a series of measures adopted to construction of Xietai Station. These measures include adjusting concrete amount, raising construction material temperature, making insulation of equipment and so on. ensure concrete quality in winter match ratio, increasing cement concrete stirring and pumping
出处
《施工技术》
CAS
北大核心
2005年第8期54-55,共2页
Construction Technology
关键词
混凝土
冬季施工
配合比
工程质量
concrete
winter construction
match ratio
project quality