期刊文献+

Biostyr~曝气生物滤池中试研究 被引量:19

Pilot study of Biostyr in Gaobeidian Wastewater Treatment Plant
下载PDF
导出
摘要 为了确认Biostyr曝气生物滤池工艺在中国的适应性,在高碑店污水处理厂进行了中试。记录和总结了2002年1月至2003年10月间的试验结果。取高碑店污水处理厂3系列初沉池出水为试验用水,试验期间水温在9-29℃。试验经历经典硝化/反硝化和同时硝化/反硝化的运行模式。以GB18918-2002为准,Biostyr滤池出水中化学耗氧量、总悬浮固体、氨基态氮、总氮等污染物均可达到其一级B标准。 It is presented the process performance results obtained during the trials period from January 2002 to October 2003, which took place in Gaobeidian WWTP, Beijing, in order to confirm the technological feasibility of the Biostyr process. The influent entering the pilot process was the plant primary effluent (after the primary sedimentation tank). The temperature of the effluent in the pilot plant during the trial period was ranged from 9 to 29 degree Centigrade. Two schemes were conducted in the sequence of the classical nitrification/denitrification and the simultaneous nitrification/ denitrification. The trials have shown that all the Biostyr configurations produced an effluent compliant with the required consents on the basic control items of the Class I Standard B of the National discharge standard of water pollutants for municipal wastewater treatment plant (GB 18918-2002).
出处 《给水排水》 CSCD 北大核心 2005年第8期14-18,共5页 Water & Wastewater Engineering
关键词 Biostyr曝气生物滤池 经典硝化/反硝化 同时硝化/反硝化 BIOSTYR 曝气生物滤池 中试研究 2003年10月 硝化/反硝化 2002年1月 污水处理厂 Biostyr biological aerated filter Classical nitrification/denitrification Simultaneous nitrification/denitrification
  • 相关文献

参考文献10

  • 1周健,罗固源,刘国涛,吉方英.碳氮比、污泥浓度及水温对城市污水生物脱氮的综合影响[J].中国给水排水,1998,14(3):52-54. 被引量:2
  • 2张小玲,彭党聪,王志盈.传统与短程反硝化的影响因素及特性研究[J].中国给水排水,2002,18(9):1-3. 被引量:22
  • 3曹国民,赵庆祥,高广达.生物除磷脱氮工艺技术研究[J].中国环境科学,1996,16(1):68-72. 被引量:15
  • 4Bruno Lacamp, Flemming Hansen, Philippe Penillard, et al.Wastewater nutrient removal with advanced biofilm reactors. Wat Sci Tech, 1993, 27(5/6) :263--276.
  • 5K H Sorensen, D Thornberg, K F Janning. Using advanced control, post-denitrification and equalization to improve the performance of a submerged filter. War Sci Tech, 2000, 41 (4/5) :177-- 184.
  • 6N Puznava, S Zeghal, E Reddet. Simple control strategies of methanol dosing for post-denitrification. War Sci Tech, 1998, 38(3):291--297.
  • 7M Payraudeau, C Paffoni, M Gousailles. Tertiary nitrification in an up flow biofilter on floating media: influent of temperature and COD load. Wat Sci Tech, 2000, 41 (4/5) : 21 -- 27.
  • 8T Thogerson, R Hansen. Full scale parallel operation of a biological aerated filter (BAF) and activated sludge (AS) for nitrogen removal. Wat Sci Tech, 2000, 41(4/5) : 159-- 168.
  • 9Slim Zeghal, Nelu Puzmava, Jean Philippe Subra, et al. Process control for nutrients removal using lamella sedimentation and floating media Filtration. War Sci Tech, 1998, 38(3) :227--235.
  • 10张建新,王洪臣.北京市高碑店污水处理厂污泥膨胀的研究及控制对策[J].给水排水,2003,29(7):8-12. 被引量:16

二级参考文献9

共引文献51

同被引文献92

引证文献19

二级引证文献76

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部