摘要
五龙金矿因采场上部存在着较大的空区,地压现象较为严重。采用充填空区的方案来控制地压,并应用弹塑性有限元方法对该方案进行了数值模拟。模拟结果表明,在充填情况下进行采矿,应力和塑性区均得到了改善。
A big mined-out space on the top of the ore site at Wulong Gold Mine has led to ahigh underground pressure. A method of filling the upper empty room was adopted and simulatedusing elasto-plastic finite element methods, The results showed that the filling method iseffective in improving the stress conditions and plastic zones.
出处
《矿冶工程》
CAS
CSCD
北大核心
1995年第4期12-15,共4页
Mining and Metallurgical Engineering
关键词
采场
地压
数值模拟
塑性区
金矿
充填
Stope, Underground pressure, Numerical simulation, Plastic zone