摘要
新疆钢铁公司八一钢铁总厂喷煤系统设计年平均喷煤量为100kg/t,最大喷煤量为160kg/t。喷煤系统设有先进的防爆装置,喷吹用煤为V^r=31.46%的高挥发分烟煤。
The coal injection system at Bayi Iron & Steel General Works of Xinjiang Iron & Steel Co.was designed with the average coal injection rate of 100kg/tHM and the maximum coal injection rate of 160kg/tHM.The advanced explosion-proof equipment was installed in this system.The coal for injection is bituminous coal with volatility (Vr) of 31-46%.
出处
《炼铁》
北大核心
1995年第3期1-4,共4页
Ironmaking
关键词
高炉
烟煤
设计
喷煤
blast furnace,pulverized coal injection,bituminous coal,design