摘要
阐述了我国高炉焦丁回收及利用的现状。我国目前存在着焦丁回收地点不当、回收量不足及焦丁与矿石混匀方法不完善等方面的问题。举出了2个焦丁回收及供应系统设计实例,并提出了一种新的焦丁回收方案。
The present situation of coke nut recovery and utilization in China is described.Now there are some problems such as unsuitable recovering location,insufficient recovering quantity,imperfect ore-coke nut mixing method and so on.Two examples of design for coke nut recovering and supplying system are introduced and a new coke nut recovery scheme is put forward.
出处
《炼铁》
北大核心
1995年第5期17-21,共5页
Ironmaking
关键词
焦丁
矿焦混装
回收
设计
高炉
coke nut,ore-coke mixed charging,recovery,design