摘要
天铁各高炉喷煤量现已达到90kg/t左右,4号高炉1995年3月在无富氧的情况下喷煤量达126kg/t。探讨了进一步提高喷煤量的一些技术措施,诸如:选择合适的鼓风动能;确保高炉顺行;实现均匀喷吹;适当提高煤粉细度;改造喷煤系统等。
At present the coal injection rate of 90kg/tHM has been reached at Tianjin Ironworks.The coal injection rate of 126kg/tHM was reached at No.4 BF without oxygen-enriched blast in March,1995-Some technical measures of raising the coal injection rate are put forward,such as selecting reasonable blast momentum,ensuring blast furnace smooth and stable operation,realizing even coal injection,properly reducing pulverized coal size,etc.
出处
《炼铁》
北大核心
1995年第6期21-23,共3页
Ironmaking
关键词
高炉
喷煤
置换比
鼓风
粒度
煤粉
blast furnace pulverized coal injection measure.