摘要
运用模糊数学方法,对桥梁施工招标中的诸多因素进行了综合评判,得到了相应的模糊矩阵,为择优决策中标单位提供了一种科学定量的分析方法。
Fuzzy mathematics method is uxed to pass a comprehensive judgement on quite a few factors in bid-ding for bridge project constructlon, and relevant fuzzy matrixes are obtained therefrom。 The method, togetherwith the matrixes presented, is proved to be a scientific approach of quantitative analysis in determining the bestbidder。