期刊文献+

调峰机组主蒸汽管道蠕变疲劳交互作用寿命研究 被引量:2

EFFECT OF CREEP-FATIGUE INTERACTION ON STEAM MAINS WITH PEAK LOADING
下载PDF
导出
摘要 本文研究调峰机组主蒸汽管道在蠕变疲劳交互作用下的性能和损伤,以及加载持续时间对蠕变疲劳交互作用寿命的影响和加载速度对蠕变疲劳寿命的影响。研究的钢种有12CrMo、15CrMo、15CrMoV、10CrMo910。此研究为制定调峰机组在蠕变疲劳交互作用条件下的寿命判废标准和优化调峰机组启停方案,缩短启停时间,提供了可靠根据。 Based on extensive investigation and tactings, this paper presents a study Of the remainins lives of 12CrMo,15CrMo,15Cr1Mo1V and 10CrMo910 steam mains used in power plants with peak-loading, which were effeCted by creep-fatigueinteraction.Testings of creeplatteue interaction were conducted at hish temperatures and under controlled load conditionswith a dwell-time.Metullurgical examinations were carried out top to determine the extent of creep and fatigue demapeand the deterioration of microstructure. As a direct result of this study,more reasonable procedures of unit start-up andshut-down are propased and some failure criterions suasested.
出处 《热力发电》 北大核心 1995年第1期26-32,37,共8页 Thermal Power Generation
  • 相关文献

同被引文献16

引证文献2

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部