摘要 通过研究有关实测及分析资料,认为南水北调中线穿黄工程所在河段的河床演变,受其上游来水来沙条件变化及本段河床边界条件的影响很大,特别是三门峡水库兴建和改建运用以及一系列河势控导工程修建前后,该段河床演变特点也随之发生变化。此外,本文还对该段河床变化趋势,特别是对小浪底水库兴建的影响进行了预估,并介绍了模型试验中该段河床的变化情况。 Analysis of field and experimental measurements indicates that fluvial process at the river segment where the project of the central route of conveying water from Southern China to Northern China across the Yellow River is greatly affected by the incoming sediment and water from upper stream as well as the. local river boundary conditions. Especially at time before and after the construction and remodeling of the Sanmenxia Reservoir and after the construction of a series of flow directing engineering works, the characteristics of fluvial process in this segment has changed significantly. In addition, the future trend of nuvial process in this segment and especially the influence of Xiaolangdi reservoir have been predicted. This paper also introduced the situation of change observed from physical modeling.
作者 高幼华
机构地区 长江科学院
出处 《人民黄河》 北大核心 1995年第3期12-15,共4页 Yellow River
关键词 南水北调工程 河床 冲淤 河道演变 fuvial process, degrakation and aggradation, project across the Yellow River, central route of conveying water from Southern China to Northern China
  • 相关文献

参考文献2

二级参考文献2

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部