期刊文献+

小浪底土石坝三维地震反应分析 被引量:3

Three-dimensional Analysis on Earthquake Response of the Xlaolangdi Earth-Rockfill Dam
下载PDF
导出
摘要 根据小浪底斜心墙堆石坝坝基砂砾石以及有关坝料在循环荷载作用下的孔隙水压增长模型以及残余变形模型,对该坝进行二维地震反应分析。地震加速度时送线是根据世界银行咨询专家为小浪底提出的地震反应谱经过人工合成得到的。分析结果表明,在地震作用下,虽然坝踵砂砾石地基以及上游淤积土表层均有一定范围的液化破坏区,但由于坝唾液化区离大坝坝体较远,因而只影响到坝踵压戗的局部;上游反滤层局部区域有破坏的可能,但由于区域较小,与渗透性良好的堆石体相邻,对坝体不构成威胁。 ccording to the model of pore water pressure growth under cyclic loading for gravel and relevant materials in the dam foundation and the model of permanent deformation, a threedimensional earthquake response analysis was performed for the sloping core earth-rockfill dam of the Xiaolangdi Multipurpose Dam Project. The curve of earthquake accleration process was composedsynthetically from the earthquake response spectrum provided by the consulting experts of theWorld Bank. An analysis indicates that even though Liquefaction zones exist in the gravel base of;the dam heel and the surface layer of the deposition at the upstream, these zones are at a distancefrom the main dam body. Therefore. the influence will be limited to part of the rockfill buttress atthe dam heel. Possible failure may also be induced in some upstream regions of the filter layer.Nevertheless, the failure area is minimal and its location is adjacent to the rook fill zone. which hasa good permeability. Thus, the dam body is not in danger.
出处 《人民黄河》 CAS 北大核心 1995年第6期35-39,共5页 Yellow River
关键词 土石坝 三维地震反应 液化 小浪底工程 Sloping core earth-rockfill dam, effective stress, three dimensional earthquake response, liquefaction. Xiaolangdi Multipurpose Dam Project.
  • 相关文献

参考文献1

二级参考文献2

共引文献4

同被引文献15

  • 1潘恕,沈凤生,杨宗茂,耿晔.小浪底斜心墙堆石坝的地震反应分析[J].人民黄河,1994,17(8):36-39. 被引量:6
  • 2孔宪京,邹德高,邓学晶,刘莹光.高土石坝综合抗震措施及其效果的验算[J].水利学报,2006,37(12):1489-1495. 被引量:53
  • 3HARDIN B O, DRNEVICH V P. Shear modulus and damping in soil: designing equations and curves[J].Journal of the Soil Mechanics and Foundations Division, ASCE, 1972, 98 (7) : 667 - 692.
  • 4沈珠江 黄锦德 王钟宁.陡河土坝的地震液化及变形分析.水利水运科学研究,1984,(1):52-61.
  • 5SEED H B, IDRISS I M. Simplified procedures for evaluating soil liquefaction potential[J]. J Geot Eng, ASCE, 1971 (9) : 1249 - 1273.
  • 6周建 白冰.土动力学理论与计算[M].北京:中国建筑工业出版社,2001..
  • 7SEED H B.Soil liquefaction and cyclic mobility evaluation for level ground during earthquakes[J].Geotechnical Engineering Division,ASCE,1979,105(2):201-255.
  • 8SEED H B,IDRISS I M.Ground motions soil liquefaction during earthquakes[M].Berkeley AC:Earthquake Engineering Research Institute,1982.
  • 9YOUD L,IDRISS I M.Workshop on evaluation of liquefaction resistance of soils[C]//Proceeding of the National Center for Earthquake Engineering Research.Salt Lake City:Utah,1997.
  • 10陈生水,霍家平,章为民.“5.12”汶川地震对紫坪铺混凝土面板坝的影响及原因分析[J].岩土工程学报,2008,30(6):795-801. 被引量:124

引证文献3