期刊文献+

三门峡水电站6号机扩装工程简介

Brief Introduction of Sixth Generating Unit Extension in Sanmen Gorge Hydropower Station
下载PDF
导出
摘要 三门峡水电站6号机扩装工程自1991年4月开工至1994年4月试运行结束,历时3年。此次扩建的主要原因是电站原装机容量偏小,河南省电网缺少相应的调峰机组,现有机组运行工况差等。本文简要介绍了该工程的设计与施工情况。主要内容有;主要技术经济指标,进水口、厂房、尾水以及升压变配电及中控室改造工程等。 ixth generating unit extension of Sanmen Gorge Hydropower Station began in April 1991and completed test operation in April 1994. The major reasons for making the project are as follows: the original installed capacity was comparatively too small, there are lack of correspondingpeak modulation set in Henan eletrified wire netting, and the existing generating units are operated unwell. This paper introduces briefly the design and construction of the extension project, inwhich the main contents includes. water intake improvement, factory building, tail water. step-uptransformation and distribution, and central control house amelioration. and so on.
作者 张金良
出处 《人民黄河》 北大核心 1995年第9期4-6,共3页 Yellow River
关键词 三门峡水电站 水轮发电机组 设计 安装 扩建 construction, design. extension. sixth generating unit, Sanmen Gorge HydropowerStation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部