摘要
右江百色水利枢纽混凝土重力坝较高,地质复杂,本文用非线性有限元程序进行计算,研究坝基材料为非线性时对坝体位移和应力的影响,基础处理不同方案对坝体位移和应力的影响,可为该坝基础处理措施提供依据。
hoe concrete gravity dam on the Youjiang River is high with complicated geological conditions. In thispaper, calculation is carried out by non - linear program to investigate the effect of non - linear dam foundationmaterials on the displacement and stresses of the dam and the effect of different schemes of foundation treatment on thedisplacement and stresses of the dam, so as to offer a basis for foundation treatment measures of the dam.
出处
《人民珠江》
1995年第1期30-34,共5页
Pearl River
关键词
混凝土重力坝
非线性
有限元
平面
计算
Level of checking flood Non - linear calculation Principal stress