摘要
本文对大型导管架在渤海海域利用下水驳船下水扶正的方法进行了研究,对下水时提供附加浮力的浮筒的布置进行了分析,并以辽东湾SZ36—1油田卫星区钻井导管架的一个设计方案为例,用OSCAR程序进行了计算,同时讨论了安装、就位中的一些问题。
A description of the study of launching and upending heavy jackets in the Bohai Gulf area using launching barges is given in this paper. Varying positions of buoyancy tanks and buoyancy forces during launch are analyzed. The drilling jacket in this paper plan for the satellite area of SZ 36-1 oil field in Liaodong Bay as the actual example is calculated through the OSCAR program. Also, several problems encountered, during installation and positioning are discussed.
出处
《中国海上油气(工程)》
1989年第1期20-28,共9页
China Offshore Oil and Gas