摘要
本文介绍了750m~3高炉砌筑时使用炭素捣打料。
This paper introduces the applying condition of carbon tamping material, spraying refractories and a vacuum cup crane in the process of constructing 750m ̄3 blast furnace body.
出处
《山东冶金》
1995年第4期10-13,共4页
Shandong Metallurgy