摘要
根据坝肩切向位移原型观测资料,对工程运用20年各阶段的坝肩弹性工作状态、工程处理效果作了分析。
On the basis of abutment tangential displacement in accordance with prototype observations,the elastic state of right abutment and remedial treatment effects during the past 20vears were analyzed in this paper.
出处
《陕西水力发电》
1995年第1期9-13,共5页
Journal of Shaanxi Water Power
关键词
拱坝
坝肩
变形观测
资料
Arch dam,Abutment,Deformation observation,Analysis