摘要
大型设备吊装的方法很多,在中原油田油气综合处理厂30万t/a催化裂化装置“两器”的吊装施工中,针对设备基础高、重量大的特点,考虑施工现场条件和吊装机具的限制,采用双桅杆夺吊法分两段进行吊装,获得成功。本文全面介绍了这种吊装方法。
During hoisting and installing a reactive reprocessor of the 300, 000t/a catalytic cracking equipment of the oil and gas treatment plant in Zhongyuan Oil Field, the reactive reprocessor was suceessfully hoisted and installed in two sections using a mast crane in order to counter the problems caused by the height of the equipment foundation and by the heaviness of the equipment.
出处
《石油工程建设》
北大核心
1995年第5期46-50,共5页
Petroleum Engineering Construction