期刊文献+

泗阳第二抽水站反向发电可行性研究 被引量:1

Feasibility Study on Power Generation in Reverse in Siyang Second Pump Station
下载PDF
导出
摘要 综合分析伯阳二站水力资源、反向发电运行方式及反向同转速发电的经济效益,反向同转速发电在技术上可行,经济上亦合理.伯阳二站利用上游余水反向发电的经济效益和社会效益比较显著,它是大型电力抽水站走以水养水道路的天佳途径之一. This paper analyzes the Siyang Second Pump Station for water resources, the operating way of power generation in reverse and the economic benefit when reverse power generation with the same operating rate- The conclusion is that the Siyang Second Pump Station reverse power generation with the same operating rate is feasible in technology and reasonab1e in economy. The analysis result of the Siyang Second Pump Station makes known that the economic and sociol benefits of pump sta-tion using surplus water to reverse power generation are notable and it is one of the best way for great power pump stations to run itself pertectly well.
出处 《水利水电技术》 CSCD 北大核心 1995年第9期18-21,共4页 Water Resources and Hydropower Engineering
关键词 抽水蓄能水电站 反向发电 可行性 运行 pump station, reverse power generation, feasibi1ity
  • 相关文献

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部