期刊文献+

红山水电站采用爆破膜装置取代调压塔 被引量:1

Adoption of blasting membrane in Hongshan Hydropower Station
全文增补中
导出
摘要 红山水电站装有4台1600kW机组,属长压力引水管、多岔管和机组型号不一的电站,甩负荷时水击波在多岔管中的反射与传递情况比较复杂,曾考虑过调压塔及水阻器方案,因投资大、施工困难或动作不灵达不到预期效果而放弃。采用爆破膜装置,投资少结构简单,运行维护方便,且已有运行经验,红山水电站最终采用爆破膜装置。 Hongshan Hydropower station is a station that has long penstocks, manifold and different types of turbines.The reflection and transmission of water hammer caused by unloading in the manifold is very complicated. The original design is to employ a surge shaft and hydraulic resistant devices. The design was abandoned because of large investment,difficult construction or hard operation. Blast membrane was adopted, which is characterized by lowinvestment,simple structure,and easy operation and maintenance.
出处 《水力发电》 北大核心 1995年第6期67-69,共3页 Water Power
关键词 大型 水电站 爆破膜装置 调压塔 红山水电站 Hongshan Hydropower Station,blasting membrane facility
  • 相关文献

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部