摘要
综合考虑了影响施工导流基本方式选择的多种因素,应用层次分析法及模糊综合评判原理,为大中型水电工程的前期设计,提供了一个合理选择导流方式的综合评判决策方法。
The various factors affeting choice of basic construction diversion way are synthetically considered.The administractive analysis and fuzzy synthetical judge theory applied and a synthetical judge method is pre-sented for choosing diversion way reasonablly for the earlier period design of large or middle water resourcesproject.
出处
《水电站设计》
1995年第1期7-14,共8页
Design of Hydroelectric Power Station
关键词
导流
工程施工
模糊数学
综合评判
选择
方案
construction diversion,scheme choice, fzzy mathematics,administractive analysis,svnthcticaljudge.