摘要 在分流河段修建水电工程,因受工程建设的影响,其下游的水位流量关系曲线将不再是单一曲线,而是一束以全断面流量为参数的曲线组。这束曲线中的任一曲线应通过3个特征点。曲线起点、天然分流点、曲线终点,这3个点确定后,即可推求不同总流量情况下的水位流量关系曲线。 Because of the effect of construction, the water level-discharge curve on the downstream of a split flow river section will not be a single curve, but a group of curves based on whole cross-section discharge. Any of the curves shall pass three characterized points- the starting point of the curves, natural split flow point, and the terminal point of the curves; After the determination of these points, the water level-discharge curves with different total discharge can be derived.
作者 杨毅
出处 《水力发电》 北大核心 1995年第1期20-22,共3页 Water Power
关键词 水电站 水位 流量 相互关系 坝址 Hydropower station, split flow river section, water level-discharge curves, the starting point of curves, natural split flow point, the terminal point of curves, flow condition of water flow
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部