李家峡水电站导流洞进口洞脸边坡处理及进洞措施 被引量:1

Side slope treatment of Lijlaxia diversion tunnel and measures to start tunnelling
全文增补中
导出
摘要 李家峡水电站导流洞进口,地势陡峭,坡面自然高度达200余m。高程2130m平台以下为85m高的洞脸边坡,该部分坡积物清除完后,意外地出现了NS向及NE向两组密集度很高的构造裂隙。这两组裂隙与岩层相互切割形成的不稳定体导致提前进洞失败。因此,如何在裂隙极为发育的薄层混合岩边坡上成洞便成了工程前期的头号技术难题。 The upstream side of the diversion tunnel in Lijiaxia Hydropower Station is a steep slope with a height of 200m. Below the terrace with an elevation of 2130m is a side slope with a height of 85 m,where the entrance of the tunnel was planed to be opened. After talus materials were removed,there were two grouped high density formation cracks in direction of NS and NE. The two grouped cracks cut the rock stratum to form a unstable rock body.Thus,how to cut a tunnel under these geologic conditions i& a number one problem.
出处 《水力发电》 北大核心 1995年第6期51-54,共4页 Water Power
关键词 水电站 导流隧洞 洞脸边坡 结构面 处理 upstream side slope of tunnel,structural face,sustaining
  • 相关文献

同被引文献8

引证文献1

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部