摘要 羊湖电站建成后主要送电拉萨电网,并与山南、日喀则电网相连,是西藏电力系中的骨干电站。电气主结线采用发电机一变压器单元结线。电站主机设备采用国际招标。水轮机为竖轴三喷咀水斗式,抽水蓄能泵为立轴单吸6级离心式水泵。发电-电动机为竖轴悬式空气冷却SSV265/8-150型。 Yangzhuoyong Lake Hydropower Station will mainly supply power for Lhasa Power System and connect with Shannan Power Network and Ridaze Power Network. It will become a mainstay power plant in Tibet Power System. The master electrical connection adopted generator-transformer's unit connection. The main equipment was purchased by international bidding. The turbine is a vertical-shaft, three nozzle Petion turbine and the pump is a vertical-axix .single suction. 6-lift centrifugal pump. The generator-motor is SSV26o / 8- 150, a type of vertical-shaft,suspended, air-cooling.
作者 刘正丰
出处 《水力发电》 北大核心 1995年第11期12-14,共3页 Water Power
关键词 抽水蓄能水电站 电气设备 电气主结线 水轮机 Yangzhuoyong Lake Hydropower Station, master electrical connection, turbine,pump, generator-motor
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部